PROJECT THERMOSOLAR Production: 4.050 m3/day River water treatment plant to produced <0,1 ppm water, installed in two thermosolar power stations in Córdoba (Spain).
- Includes primary treatment.
- Designed to withstand the highest temperatures.
- Turnkey project.